Skip to content Skip to footer

Shipping Engineering Furnace from Guangzhou/Shenzhen to Timaru Port, New Zealand – 20FT/40FT Full Container and LCL Shipping

Shipping Engineering Furnace from Guangzhou/Shenzhen to Timaru Port, New Zealand – 20FT/40FT Full Container and LCL Shipping

Shipping Methods: FCL and LCL

  1. FCL (Full Container Load)
    For larger shipments, such as an entire engineering furnace, the best choice would be a 20FT or 40FT container. Full Container Load (FCL) ensures that the goods occupy the whole container, making the shipment more secure and efficient. Shipping an engineering furnace in an FCL means the furnace is the sole cargo in the container, minimizing the risk of damage from other goods and ensuring better control over the shipping process.

  2. LCL (Less than Container Load)
    If the shipment does not require a full container, Less than Container Load (LCL) is a more cost-effective solution. LCL involves consolidating multiple smaller shipments from different customers into one container. This method may involve a slightly longer transit time due to consolidation and deconsolidation procedures at both the origin and destination ports. However, it can significantly reduce the shipping costs for smaller shipments, such as smaller parts of a furnace or related accessories.

Shipping Timeframe and Transit

The average sea shipping time from Guangzhou or Shenzhen to Timaru Port is approximately 23 days. This transit time can vary depending on the shipping route, weather conditions, and other factors affecting international shipping schedules. Timaru, being a smaller port, may require a more specialized shipping route compared to larger ports like Auckland or Wellington, so it’s essential to consult with your shipping company for the exact timeline.

Packaging the Engineering Furnace

Proper packaging is crucial when shipping heavy and complex items such as engineering furnaces. These items are sensitive to both external impacts and environmental conditions during transit. Here’s a breakdown of how these items should be packaged:

  1. Crating: The furnace should be securely crated, with a strong wooden frame and steel reinforcement. Crating helps protect the furnace from external damage caused by rough handling or accidental impacts. The crate should be custom-built to fit the dimensions of the furnace precisely.

  2. Protection from Moisture: Considering the long transit time and exposure to potential sea spray, the furnace should be wrapped with moisture-resistant materials. Using a moisture-absorbent liner or desiccants inside the crate will help prevent rust or corrosion.

  3. Securing the Load: Once packed in the container, the furnace must be firmly secured using strong ropes, steel straps, and additional dunnage. This will prevent the furnace from shifting during the voyage, which could otherwise lead to damage.

  4. Customs and Labeling: Ensure that the shipment is properly labeled with the necessary documentation for customs clearance. This includes invoices, packing lists, and any required certifications for engineering equipment, such as CE or other international standards certifications. Proper labeling will speed up the clearance process and avoid delays at customs in New Zealand.