Skip to content Skip to footer

Shipping from Guangzhou/Shenzhen to Thessaloniki, Greece: 20FT/40FT Full Container Load (FCL) and Less Than Container Load (LCL) Sea Freight Options

Shipping from Guangzhou/Shenzhen to Thessaloniki, Greece: 20FT/40FT Full Container Load (FCL) and Less Than Container Load (LCL) Sea Freight Options

When considering shipping kitchen storage goods from Guangzhou or Shenzhen, China, to Thessaloniki Port in Greece, both Full Container Load (FCL) and Less Than Container Load (LCL) options are available. This article will walk you through the logistics, transport process, and packaging requirements for both options.

1. Shipping Overview

  • Departure Ports: Guangzhou and Shenzhen (two of the busiest ports in China)
  • Destination Port: Thessaloniki Port, Greece
  • Sea Freight Duration: Approximately 35 days
  • Shipping Options:
    • Full Container Load (FCL): 20FT and 40FT containers
    • Less Than Container Load (LCL): Consolidated shipments for smaller quantities

2. Full Container Load (FCL) – 20FT/40FT

FCL is the preferred option if you have a larger volume of goods to ship. This method ensures that your goods are shipped in a dedicated container, which is typically more cost-effective for larger shipments. Depending on the volume and size of your kitchen storage items, you can choose between a 20FT or 40FT container.

  • 20FT Container: Suitable for smaller quantities, this container can hold up to 28 cubic meters of cargo. It’s ideal for businesses with medium-sized shipments or those with limited storage space.
  • 40FT Container: This larger container holds up to 56 cubic meters of cargo. It’s perfect for bigger shipments and offers more space, which can reduce per-unit shipping costs.

CIF (Cost, Insurance, and Freight): The CIF shipping method includes the cost of transportation, insurance, and freight charges. This option ensures that your goods are covered against risks during transit.

3. Less Than Container Load (LCL)

If you don’t have enough cargo to fill a full container, LCL is a more economical solution. With LCL, your goods will be consolidated with shipments from other customers, sharing container space. This reduces your shipping costs while still offering flexibility.

  • Shipping Time: LCL shipments typically take a little longer than FCL, but the difference is often negligible for shipments going to Thessaloniki Port, Greece. Expect an approximate shipping duration of 35 days from China to Greece, though transit times can vary based on seasonal factors and port congestion.

CIF Option for LCL: Like FCL, LCL can also be shipped under the CIF Incoterm, ensuring that all costs associated with transportation and insurance are covered.

4. Packaging Requirements

Proper packaging is essential to ensure that your kitchen storage items arrive at Thessaloniki Port in perfect condition. Below are key considerations for both FCL and LCL shipments.

  • Kitchen Storage Goods: Typically, kitchen storage items like shelves, cabinets, organizers, and containers are made of materials like metal, plastic, and wood. These items should be carefully packed to prevent damage during long sea voyages.

  • Packaging for FCL:

    • Wooden Pallets: For FCL shipments, kitchen storage items should be placed on sturdy wooden pallets. This ensures the goods are stable during transit and can be easily loaded/unloaded from the container.
    • Shrink Wrap and Stretch Film: Once the items are on pallets, they should be wrapped in shrink wrap or stretch film to secure them and prevent damage from moisture or movement during transit.