Skip to content Skip to footer

Shipping from Guangzhou/Shenzhen, China, to Obuasi, Ghana: CIF Full Container (20FT/40FT) and LCL Shipping Overview

Shipping from Guangzhou/Shenzhen, China, to Obuasi, Ghana: CIF Full Container (20FT/40FT) and LCL Shipping Overview

Shipping Options

1. Full Container Load (FCL):

  • Container Sizes: 20FT and 40FT containers.
  • Delivery Terms: CIF (Cost, Insurance, and Freight) to Obuasi City Limits.
  • Advantages:
    • Suitable for larger shipments that can fill an entire container.
    • Offers better cost-efficiency for bulk cargo.
    • Minimizes the risk of damage by keeping goods separate from other shipments.

2. Less-Than-Container Load (LCL):

  • Definition: Combines smaller shipments from multiple shippers into one container.
  • Advantages:
    • Cost-effective for smaller quantities of goods.
    • Allows shippers to benefit from sea freight without needing to fill an entire container.

Transit Time:

The estimated sea freight duration from Guangzhou/Shenzhen to Obuasi is approximately 36 days, depending on factors such as port congestion and customs clearance.

Packaging Guidelines

Proper packaging is essential for ensuring the safety and integrity of goods during transit. Here’s how to prepare your cargo:

1. Materials Used for Packaging:

  • Strong Carton Boxes: For lighter and durable items.
  • Wooden Crates or Pallets: For heavy or fragile goods, providing extra stability.
  • Plastic Wrapping: To protect against moisture and dust.
  • Bubble Wrap or Foam: To cushion fragile items.

2. Packing Methods:

  • Stacking: Ensure goods are stacked evenly to avoid shifting during transit.
  • Labeling: Clearly label the boxes with details like destination, handling instructions, and product description.
  • Palletization: Use pallets to streamline loading and unloading while preventing direct contact with the container floor.

3. Considerations for Shipping Punched Mesh:

  • Secure Bundling: Ensure the punched mesh is tightly rolled or stacked and secured with straps.
  • Moisture Protection: Use plastic film to protect against rust caused by humidity during sea transit.
  • Corner Protection: Install corner protectors to prevent damage to the edges of the mesh.

Documentation Requirements

  • Commercial Invoice: Lists the product details, value, and terms of sale.
  • Packing List: Itemizes the contents of the shipment for customs.
  • Bill of Lading (BOL): Serves as a shipping receipt and title for the goods.
  • Certificate of Insurance: Confirms that the cargo is insured under CIF terms.